IM-2 Batch Treatment System Planning, Operations, and Monitoring

Type Download Title Publish Date Size
Click to Download Submittal of Closure Report for Interim Measures No. 2 PG&E Topock Compressor Station, BLM Groundwater Batch Treatment System Needles, California June 2, 2009 2.49 MB
Click to Download Batch Treatment Facility Decommissioning Work Plan, PG&E Topock Compressor Station, Needles, California May 31, 2007 2.51 MB
Click to Download Interim Measures No. 2, Batch Treatment Facility Decommissioning Activities Update - Tanks and Equipment Decommissioning and Lay-Up and Removal of Support Facilities March 29, 2006 1.43 MB
Click to Download Fourth Quarter 2005 and Annual Performance Monitoring Evaluation Interim Measures Performance Monitoring Program March 15, 2006 13.21 MB
Click to Download Discontinuation of IM2 Batch Treatment Operations September 6, 2005 912.79 KB
Click to Download Draft Well 20 Bench Decommissioning Work Plan August 8, 2005 2.1 MB
Click to Download IM2 Batch Treatment Plant Spill Event April 10, 2005, Event and Cleanup Report August 5, 2005 1.21 MB
Click to Download IM2 Floodplain Area Performance Monitoring Report for June 2005 July 15, 2005 2.63 MB
Click to Download Groundwater Elevation and Hydraulic Gradient Error Analysis IM No. 2 (Copy) June 23, 2005 1.14 MB
Click to Download Spill Event April 10, 2005 Background Sample Depth Profile Results June 23, 2005 526.32 KB
Click to Download Spill Event April 10, 2005 Background Sample Depth Profile Results June 23, 2005 526.32 KB
Click to Download IM2 Floodplain Area Performance Monitoring Report for May 2005 June 15, 2005 3.47 MB
Click to Download IM2 Floodplain Area Performance Monitoring Report for April and First Quarter 2005 May 31, 2005 4.21 MB
Click to Download Spill Event April 10, 2005 Preliminary Results Confirmation Sampling April 29, 2005 285.25 KB
Click to Download Interim Measures Extraction System Operation and Maintenance Plan April 22, 2005 4.1 MB
Click to Download Spill Event April 10, 2005 Confirmation Sampling Workplan April 22, 2005 588.2 KB
Click to Download Draft Performance Monitoring Plan for Interim Measures in Floodplain Area (Copy) April 15, 2005 3.53 MB
Click to Download Authorization Request for MW-20 Bench Pump and Treat Operations Extension April 8, 2005 208.77 KB
Click to Download Final Extraction Well Installation Work Plan - March 15, 2005 March 15, 2005 2.44 MB
Click to Download Performance Monitoring Report No. 15 - March 15, 2005 March 15, 2005 2.83 MB
Click to Download Performance Monitoring Report No. 14 - February 15, 2005 February 15, 2005 3.08 MB
Click to Download Contingency Planning Sentry Well Groundwater Monitoring - February 2005 February 1, 2005 287.52 KB
Click to Download Performance Monitoring Report No. 13, Interim Measures No. 2 January 15, 2005 3.93 MB
Click to Download Performance Monitoring Report No. 12, Interim Measures No. 2 December 15, 2004 3.45 MB
Click to Download Performance Monitoring Report No. 11, Interim Measures No. 2 November 15, 2004 6.72 MB
Click to Download Performance Monitoring Report No. 10, Interim Measures No. 2 October 15, 2004 1.36 MB
Click to Download Performance Monitoring Report No. 9, Interim Measures No. 2 September 15, 2004 1.63 MB
Click to Download Performance Monitoring Report No. 8, Interim Measures No. 2 August 15, 2004 1.61 MB
Click to Download Performance Monitoring Report No. 7, Interim Measures No. 2 July 15, 2004 2.37 MB
Click to Download Performance Monitoring Report No. 6, Interim Measures No. 2 July 1, 2004 4.12 MB
Click to Download Performance Monitoring Report No. 5, Interim Measures No. 2 June 15, 2004 1.9 MB
Click to Download Performance Monitoring Report No. 4, Interim Measures No. 2 June 1, 2004 2.06 MB
Click to Download Performance Monitoring Report No. 3, Interim Measures No. 2 May 15, 2004 1.43 MB
Click to Download Batch Treatment Workplan (Interim Measures No. 2) April 30, 2004 1020.42 KB
Click to Download Performance Monitoring Report No. 2, Interim Measures No. 2 April 30, 2004 2.11 MB
Click to Download Performance Monitoring Report No. 1, Interim Measures No. 2 April 15, 2004 33.02 MB
Click to Download Sampling Plan Supplement, Interim Measures Drilling Program April 13, 2004 1.17 MB
Click to Download Final Interim Measures No. 2 Workplan March 2, 2004 2.04 MB
Click to Download Addenda to Interim Measures No. 2 Workplan March 1, 2004 5.26 MB
Click to Download CEQA Notice of Exemption for Interim Measures No. 2 February 10, 2004 131.31 KB