Click on the boxes in the flow-chart below to view documents from each phase of the process.
IM-3 Treatment System Construction
Type | Download | Document Name | Publish Date | Size |
---|---|---|---|---|
Click to Download | Notice of Termination WDID No. 736C329173 NPDES General Permit No. CAS000002 Interim Measure No. 2 | June 27, 2006 | 2.22 MB | |
Click to Download | Installation Report for Extraction Well TW-3D | December 29, 2005 | 2.29 MB | |
Click to Download | Interim Measures No. 3 Treatment and Extraction System - Construction Completion Report | October 18, 2005 | 5.74 MB | |
Click to Download | Groundwater Extraction Well PE-1 Installation Report | May 2, 2005 | 6.58 MB | |
Click to Download | Interim Measures Phase 2 Monitoring Well Installation Report | May 2, 2005 | 11 MB |