Click on the boxes in the flow-chart below to view documents from each phase of the process.
Other Documents
Type | Download | Document Name | Publish Date | Size |
---|---|---|---|---|
Click to Download | Final Corrective Measures/Feasibility Study Work Plan | March 6, 2008 | 2.42 MB | |
Click to Download | Responses to Agency and Stakeholder Comments on the Corrective Measures/Feasibility Study Work Plan | October 5, 2007 | 241.95 KB | |
Click to Download | Corrective Measures / Feasibility Study Work Plan | June 29, 2007 | 2.31 MB | |
Click to Download | DTSC CMS Work Plan Comments | May 15, 2007 | 83.85 KB | |
Click to Download | Tech Memo: Preliminary Concepts for Soil-Bentonite Cutoff Wall | April 14, 2004 | 299.96 KB |