Click on the boxes in the flow-chart below to view documents from each phase of the process.
IM-3 Injection Area Characterization
Type | Download | Document Name | Publish Date | Size |
---|---|---|---|---|
Click to Download | Proposed Modifications to the Groundwater Monitoring Plan for Interim Measures No. 3 Injection Area Compliance Monitoring Program, PG&E Topock Compressor Station, Needles, California | July 3, 2008 | 971.63 KB | |
Click to Download | Groundwater and Hydrogeologic Investigation Report for Interim Measures No. 3 Injection Area | June 22, 2005 | 14.7 MB | |
Click to Download | Baseline Groundwater Quality Technical Memorandum for the IM3 Injection Area | June 10, 2005 | 693.06 KB | |
Click to Download | Groundwater Elevation Maps for IM No. 3 Injection Area | June 10, 2005 | 1.48 MB |