Click on the boxes in the flow-chart below to view documents from each phase of the process.
RFI/RI Volume 2
Type | Download | Document Name | Publish Date | Size |
---|---|---|---|---|
Click to Download | RCRA Facility Investigation/Remedial Investigation Report Volume 2 Addendum Appendix E | June 29, 2009 | 5.75 MB | |
Click to Download | RCRA Facility Investigation/Remedial Investigation Report Volume 2 Addendum Text, Tables, Figures and Appendices A-D and F-H | June 29, 2009 | 28.15 MB | |
Click to Download | Revised Final RCRA Facility Investigation/Remedial Investigation (RFI/RI), PG&E Topock Compressor Station, Needles, California-Hydrogeological Characterization and Resuls of Groundwater and Surface Water Investigation-Text, Table, and Figures | February 11, 2009 | 35.62 MB | |
Click to Download | Revised Final RCRA Facility Investigation/Remedial Investigation (RFI/RI), PG&E Topock Compressor Station, Needles, California-Hydrogeological Characterization and Resuls of Groundwater and Surface Water Investigation-Appendices A-H2 and I-J | February 10, 2009 | 62.57 MB | |
Click to Download | Revised Final RCRA Facility Investigation/Remedial Investigation (RFI/RI), PG&E Topock Compressor Station, Needles, California-Hydrogeological Characterization and Resuls of Groundwater and Surface Water Investigation-Appendices H3-H6 | February 9, 2009 | 22.19 MB | |
Click to Download | Comments on July 2008 RCRA Facility Investigation and Remedial Investigation Report Volume 2 at PG&E, Topock Compressor Station, Needles, California (EPA ID NO. CAT080011729) | October 21, 2008 | 1.16 MB | |
Click to Download | Response to Comments Related to the Site History Portion of the RFI Report Dated February 2005 | July 13, 2006 | 3.75 MB |