Click on the boxes in the flow-chart below to view documents from each phase of the process.

Other Remedial Design/Remedial Action Documents

Type Download Document Name Publish Date Size
Click to Download 2022 Groundwater Flow and Solute Transport Model Update Draft Final December 19, 2022 57.17 MB
Click to Download DTSC Letter to PGE, Acceptance of the Cultural Resource Consultant, Groundwater Remediation at Pacific Gas and Electric Company (PG&E), Topock Compressor Station, Needles, California (EPA ID NO. CAT080011729) March 2, 2012 82.3 KB