Click on the boxes in the flow-chart below to view documents from each phase of the process.
Groundwater Evaluation and Modeling
Type | Download | Document Name | Publish Date | Size |
---|---|---|---|---|
Click to Download | Hexavalent Chromium Holding Time Study Results | January 4, 2008 | 86.19 KB | |
Click to Download | Addendum to Work Plan for Hydraulic Testing in Bedrock Wells | December 19, 2006 | 4.46 MB | |
Click to Download | Workplan for Hydraulic Testing in Bedrock Wells | November 10, 2006 | 1.55 MB | |
Click to Download | Groundwater Model Report, Section 4.4, Initial Hydraulic Parameter Assignments | August 18, 2006 | 242.02 KB | |
Click to Download | Groundwater Model Report, Section 2, Site Conceptual Model | August 4, 2006 | 16.1 MB | |
Click to Download | Evaluation of Sampling Frequencies of Topock GMP Monitoring Wells Using Monitoring and Remediation Optimization System (MAROS) Software | July 25, 2006 | 170.9 KB | |
Click to Download | Groundwater Model Update Report | July 29, 2005 | 12.44 MB | |
Click to Download | Numerical Groundwater Flow Model Simulation of Interim Measures Extraction | July 15, 2005 | 2.44 MB | |
Click to Download | IM2 Groundwater Elevation and Hydraulic Gradient Error Analysis | June 23, 2005 | 1.14 MB | |
Click to Download | Evaluation of Site-Wide Groundwater Data for Hydraulic Gradient Mapping | June 7, 2005 | 903.38 KB |