Click on the boxes in the flow-chart below to view documents from each phase of the process.
Arizona Groundwater Investigation
Type | Download | Document Name | Publish Date | Size |
---|---|---|---|---|
Click to Download | Installation Report for Wells on the Arizona Shore of the Colorado River at the PG&E Topock Compressor Station, Needles, California | August 12, 2008 | 3.26 MB | |
Click to Download | Installation Report (with Appendices) for Wells on the Arizona Shore of the Colorado River at the PG&E Topock Compressor Station, Needles, California | August 12, 2008 | 13.59 MB | |
Click to Download | Work Plan for Well Installation and Groundwater Characterization on Arizona Shore of the Colorado River at Topock, Arizona | January 16, 2007 | 9.85 MB |