Click on the boxes in the flow-chart below to view documents from each phase of the process.
Remedial Action Work Plan
Type | Download | Document Name | Publish Date | Size |
---|---|---|---|---|
Click to Download | Revised Groundwater Corrective Measure Implementation/Remedial Design (CMI/RD) Work Plan for SWMU 1/AOC 1 and AOC 10, PG&E Topock Compressor Station, Needles, California | November 2, 2011 | 12.25 MB | |
Click to Download | DTSC review of revised corrective measures implementation/remedial design work plan for the groundwater remediation at Pacific Gas and Electric Company (PG&E), Topock Compressor Station, Needles, California (EPA ID No. CAT080011729) | October 27, 2011 | 39.24 KB | |
Click to Download | DTSC Comments on the May 2011 Groundwater CMI/RD Work Plan for SWMU 1/AOC 1 and AOC 10, PG&E Topock Compressor Station, Needles, California | June 17, 2011 | 248.35 KB | |
Click to Download | Federal Comments on the Draft Corrective Measures Study/Feasibility Study Report for Chromium in Groundwater at the PG&E, Topock Compressor Station, Needles, California | June 17, 2011 | 104.66 KB | |
Click to Download | Fort Mojave Indian Tribe Comments on May 2, 2011, Document Titled, Groundwater Corrective Measure Implementation/Remedial Design Work Plan for SWMU1/AOC1 and AOC10, PG&E Topock Compressor Station, Needles, California (Document ID: PGE20110502A) | June 10, 2011 | 215.09 KB | |
Click to Download | Hualapai Comments on May 2011 Groundwater CMI/RD Work Plan: Design of Groundwater Remedy—An Opportunity to Prevent Further Damages to Cultural Resources near the PG&E Topock Compressor Station, Needles, California | June 6, 2011 | 452.63 KB | |
Click to Download | ADEQ Comments on Groundwater Corrective Measure Implementation/Remedial Design Work Plan for SWMU VAOC 1 and AOC 10, PG&E Topock Compressor Stations, Needles, California, Site Code: 506252-01 | June 3, 2011 | 107.05 KB | |
Click to Download | Metropolitan Water District of Southern California (Metropolitan) comments on the Draft Corrective Measures Implementation (CMl)/Remedial Design (RD) Work Plan (WP), PG&E Topock Compressor Station, Needles, California | June 3, 2011 | 154.76 KB | |
Click to Download | Groundwater Corrective Measures Implementation/ Remedial Design Work Plan for SWMU 1/AOC 1 and AOC 10, PG&E Topock Compressor Station, Needles, California | May 2, 2011 | 2.49 MB |