IM-3 Treatment System Planning
Type | Download | Document Name | Publish Date | Size |
---|---|---|---|---|
Click to Download | Well PGE-6 Revised Decommissioning Work Plan, PG&E Topock Compressor Station, Needles, California | November 10, 2006 | 906.31 KB | |
Click to Download | Interim Measures No. 3 Treatment and Extraction System Operation and Maintenance Plan, Revision 01, April 2006, PG&E Topock Compressor Station, Needles, California | April 14, 2006 | 13 MB | |
Click to Download | Supplement to Technical Addendum No. 1: Well Installation Work Plan for Interim Measures Performance Monitoring Program, PG&E Topock Compressor Station, Needles, California | March 15, 2006 | 376.56 KB | |
Click to Download | Technical Memorandum: Well PGE-6 Decommissioning Evaluation, PG&E Topock Compressor Station, Needles, California | February 28, 2006 | 896.51 KB | |
Click to Download | Well PGE-6 Decommissioning Work Plan, PG&E Topock Compressor Station, Needles, California | February 28, 2006 | 879.99 KB | |
Click to Download | Request for Startup of Extraction Well PE-1, PG&E Topock Compressor Station, Needles, California | January 25, 2006 | 405.04 KB | |
Click to Download | Request for Reevaluation of Monthly Average Target Pumping Rate for Interim Measures No. 3 Extraction System-2, PG&E Topock Compressor Station, Needles, California | January 23, 2006 | 461.56 KB | |
Click to Download | Addendum to Interim Measures No. 3 Compliance Monitoring Plan, PG&E Topock Compressor Station, Needles, California | December 13, 2005 | 5.77 MB | |
Click to Download | Draft Well Installation Work Plan for Interim Measures Performance Monitoring Program, PG&E Topock Compressor Station, Needles, California | November 30, 2005 | 3.96 MB | |
Click to Download | Biological Assessment of the PE-1 Pipeline and In-Situ Floodplain Study, PG&E Topock Compressor Station, Needles, California | November 4, 2005 | 4.99 MB | |
Click to Download | Work Plan for Installation of Shallow Compliance Wells, PG&E Topock Compressor Station, Needles, California | October 28, 2005 | 5.95 MB | |
Click to Download | Draft Work Plan for Installation of Supplemental Extraction Well IM Groundwater Extraction System, PG&E Topock Compressor Station, Needles, California | July 29, 2005 | 1.93 MB | |
Click to Download | Final Design Plan Conveyance Piping and Power Supply for Extraction Well PE-1, PG&E Topock Compressor Station, Needles, California | July 29, 2005 | 1.67 MB | |
Click to Download | Interim Measures No. 3, Land Use Area, PG&E Topock Compressor Station, Needles, California | July 8, 2005 | 939.75 KB | |
Click to Download | Interim Measure No. 3 Measure Planning - Baseline Soil Sampling Workplan, PG&E Topock Compressor Station, Needles, California | July 5, 2005 | 1.46 MB | |
Click to Download | Interim Measures No. 3 Injection Well Operation and Maintenance Plan Addendum No. 2, PG&E Topock Compressor Station, Needles, California | June 30, 2005 | 177.57 KB | |
Click to Download | Interim Measures No. 3 Contingency Planning for Achieving a Net Reversal of Gradient, PG&E Topock Compressor Station, Needles, California | June 29, 2005 | 24.8 KB | |
Click to Download | Addendum to Interim Measures No. 3 Injection Well Operation and Maintenance Plan, PG&E Topock Compressor Station, Needles, California | June 3, 2005 | 252.47 KB | |
Click to Download | Evaluation of Pipeline Alignments Between Extraction Well PE-1 and the MW-20 Bench, PG&E Topock Compressor Station, Needles, California | May 31, 2005 | 1.06 MB | |
Click to Download | Interim Measures Extraction System Operation and Maintenance Plan, PG&E Topock Compressor Station, Needles, California | April 22, 2005 | 4.1 MB | |
Click to Download | Interim Measures No. 3 Treatment and Extraction System Operation and Maintenance Plan, PG&E Topock Compressor Station, Needles, California | April 11, 2005 | 12.35 MB | |
Click to Download | Solid Waste Management Plan, PG&E Topock Compressor Station, Needles, California | March 24, 2005 | 260.57 KB | |
Click to Download | Final Extraction Well Installation Workplan, PG&E Topock Compressor Station, Needles, California | March 15, 2005 | 2.44 MB | |
Click to Download | Final Workplan for Injection Well Installation, Interim Measures No. 3, PG&E Topock Compressor Station, Needles, California | November 15, 2004 | 3.69 MB | |
Click to Download | Interim Measures No. 3 Workplan - Revision 1, PG&E Topock Compressor Station, Needles, California | August 27, 2004 | 986.41 KB | |
Click to Download | CEQA Notice of Exemption for Interim Measures No. 3, PG&E Topock Compressor Station, Needles, California | June 30, 2004 | 193.09 KB |