IM-3 Treatment System Planning

Type Download Document Name Publish Date Size
Click to Download Well PGE-6 Revised Decommissioning Work Plan, PG&E Topock Compressor Station, Needles, California November 10, 2006 906.31 KB
Click to Download Interim Measures No. 3 Treatment and Extraction System Operation and Maintenance Plan, Revision 01, April 2006, PG&E Topock Compressor Station, Needles, California April 14, 2006 13 MB
Click to Download Supplement to Technical Addendum No. 1: Well Installation Work Plan for Interim Measures Performance Monitoring Program, PG&E Topock Compressor Station, Needles, California March 15, 2006 376.56 KB
Click to Download Technical Memorandum: Well PGE-6 Decommissioning Evaluation, PG&E Topock Compressor Station, Needles, California February 28, 2006 896.51 KB
Click to Download Well PGE-6 Decommissioning Work Plan, PG&E Topock Compressor Station, Needles, California February 28, 2006 879.99 KB
Click to Download Request for Startup of Extraction Well PE-1, PG&E Topock Compressor Station, Needles, California January 25, 2006 405.04 KB
Click to Download Request for Reevaluation of Monthly Average Target Pumping Rate for Interim Measures No. 3 Extraction System-2, PG&E Topock Compressor Station, Needles, California January 23, 2006 461.56 KB
Click to Download Addendum to Interim Measures No. 3 Compliance Monitoring Plan, PG&E Topock Compressor Station, Needles, California December 13, 2005 5.77 MB
Click to Download Draft Well Installation Work Plan for Interim Measures Performance Monitoring Program, PG&E Topock Compressor Station, Needles, California November 30, 2005 3.96 MB
Click to Download Biological Assessment of the PE-1 Pipeline and In-Situ Floodplain Study, PG&E Topock Compressor Station, Needles, California November 4, 2005 4.99 MB
Click to Download Work Plan for Installation of Shallow Compliance Wells, PG&E Topock Compressor Station, Needles, California October 28, 2005 5.95 MB
Click to Download Draft Work Plan for Installation of Supplemental Extraction Well IM Groundwater Extraction System, PG&E Topock Compressor Station, Needles, California July 29, 2005 1.93 MB
Click to Download Final Design Plan Conveyance Piping and Power Supply for Extraction Well PE-1, PG&E Topock Compressor Station, Needles, California July 29, 2005 1.67 MB
Click to Download Interim Measures No. 3, Land Use Area, PG&E Topock Compressor Station, Needles, California July 8, 2005 939.75 KB
Click to Download Interim Measure No. 3 Measure Planning - Baseline Soil Sampling Workplan, PG&E Topock Compressor Station, Needles, California July 5, 2005 1.46 MB
Click to Download Interim Measures No. 3 Injection Well Operation and Maintenance Plan Addendum No. 2, PG&E Topock Compressor Station, Needles, California June 30, 2005 177.57 KB
Click to Download Interim Measures No. 3 Contingency Planning for Achieving a Net Reversal of Gradient, PG&E Topock Compressor Station, Needles, California June 29, 2005 24.8 KB
Click to Download Addendum to Interim Measures No. 3 Injection Well Operation and Maintenance Plan, PG&E Topock Compressor Station, Needles, California June 3, 2005 252.47 KB
Click to Download Evaluation of Pipeline Alignments Between Extraction Well PE-1 and the MW-20 Bench, PG&E Topock Compressor Station, Needles, California May 31, 2005 1.06 MB
Click to Download Interim Measures Extraction System Operation and Maintenance Plan, PG&E Topock Compressor Station, Needles, California April 22, 2005 4.1 MB
Click to Download Interim Measures No. 3 Treatment and Extraction System Operation and Maintenance Plan, PG&E Topock Compressor Station, Needles, California April 11, 2005 12.35 MB
Click to Download Solid Waste Management Plan, PG&E Topock Compressor Station, Needles, California March 24, 2005 260.57 KB
Click to Download Final Extraction Well Installation Workplan, PG&E Topock Compressor Station, Needles, California March 15, 2005 2.44 MB
Click to Download Final Workplan for Injection Well Installation, Interim Measures No. 3, PG&E Topock Compressor Station, Needles, California November 15, 2004 3.69 MB
Click to Download Interim Measures No. 3 Workplan - Revision 1, PG&E Topock Compressor Station, Needles, California August 27, 2004 986.41 KB
Click to Download CEQA Notice of Exemption for Interim Measures No. 3, PG&E Topock Compressor Station, Needles, California June 30, 2004 193.09 KB