Click on the boxes in the flow-chart below to view documents from each phase of the process.

Others

Type Download Document Name Publish Date Size
Click to Download Work Variance Request #12 - Proposed Addition of Pipelines/Conduits to Connect Existing Extraction Well TWB-3 and Deferral of the Operations Building on the Transwestern Bench October 20, 2022 2.66 MB
Click to Download Worker Environmental Awareness Training (WEAT) Material May 2022 May 1, 2022 13.44 MB
Click to Download Work Variance Request #10 - Phase 2A Pipeline Realignment February 1, 2022 12.54 MB
Click to Download Work Variance Request #11 - Proposed New Mitigation Planting Areas February 1, 2022 2.32 MB
Click to Download Night Work Lighting Plan - 72-hour Aquifer Test at TW-3D June 1, 2020 56.54 KB
Click to Download Well Decommissioning Report for Monitoring Well MW-77-46 (MW-D-46), Pacific Gas and Electric Company, Topock Compressor Station, Needles, California June 1, 2020 1.15 MB
Click to Download Work Variance Request #9 - Relocate MW-A to a location downgradient of IRZ-11 and convert IRZ-11 to monitoring well April 24, 2020 362.37 KB
Click to Download Soil Management Plan for Compressor Station Operations, PG&E Topock Compressor Station, Needles, California November 1, 2019 7.23 MB
Click to Download Work Variance Request #8 - Proposed Changes to Pipeline C Segment 6 Alignment October 8, 2019 2.73 MB
Click to Download Approval of Discharge to Land in Accordance with State Water Quality Control Order No. 2003-0003-DWQ, Pipelines G, B and J, Topock Compressor Station, Needles, California October 4, 2019 1.2 MB
Click to Download Work Variance Request #5 - Phase 1 Water Conditioning System July 22, 2019 2.07 MB
Click to Download Colorado River Basin Regional Water Quality Control Board Approval of Discharge to Land of Well Test Water in Accordance with State Water Quality Control Order No. 2003-003-DWQ, Topock Compressor Station, Southeast of Needles, California July 2, 2019 3.52 MB
Click to Download Work Variance Request #7 - Changes to Construction Headquarters and Soil Processing Yard Design June 14, 2019 7.98 MB
Click to Download Work Variance Request #6 - Pipeline F Realignment May 22, 2019 10.11 MB
Click to Download Work Variance Request #4 - Realignment of Pipeline C May 14, 2019 2.44 MB
Click to Download Work Variance Request #3 - Changes to the Construction Headquarters Design January 4, 2019 2.19 MB
Click to Download Work Variance Request #2 - Temporary Construction Water Line August 29, 2018 5.43 MB
Click to Download Work Variance Request #1 - Brine Tanks Upgrade July 5, 2018 1.14 MB