Click on the boxes in the flow-chart below to view documents from each phase of the process.
Appendix BOD
Mime type | Download | Document Name | Publish Date | Size |
---|---|---|---|---|
Click to Download | Table 2.4-1 - Reference List of Potentially Applicable Analytes and Associated Screening Levels (rev. Oct 2019) Management Protocol for Handling and Disposition of Displaced Material | May 9, 2022 | 45.84 KB | |
Click to Download | Table 2.4-1 - Reference List of Potentially Applicable Analytes and Associated Screening Levels Management Protocol for Handling and Disposition of Displaced Material (rev. April 2022) | May 9, 2022 | 2.16 MB | |
Click to Download | Table 2.4-1 - Reference List of Potentially Applicable Analytes and Associated Screening Levels Management Protocol for Handling and Disposition of Displaced Material (rev. October 2020) | May 9, 2022 | 99.87 KB | |
Click to Download | Addendum to Soil Management Plan, Final Groundwater Remedy, PG&E Topock Compressor Station, Needles, California | May 28, 2019 | 1.16 MB | |
Click to Download | Addendum to Development of Groundwater Flow and Solute Transport Models Appendices A and B, PG&E Topock Compressor Station, Needles, California | January 9, 2017 | 346.42 KB | |
Click to Download | Addendum to Development of Groundwater Flow and Solute Transport Models Figures, PG&E Topock Compressor Station, Needles, California | January 9, 2017 | 82.74 MB | |
Click to Download | Addendum to Development of Groundwater Flow and Solute Transport Models Text, PG&E Topock Compressor Station, Needles, California | January 9, 2017 | 593.46 KB | |
Click to Download | Supplemental and Errata Information for the Final (100%) Design for the Final Groundwater Remedy | November 18, 2016 | 104.65 MB | |
Click to Download | Updated Final Basis of Design Report - Appendix B Development of Groundwater Flow and Solute Transport Models | February 29, 2016 | 62.29 MB | |
Click to Download | Master Comprehensive Table of Contents for the Final (100%) Submittal Final Basis of Design Report for the Final Groundwater Remedy, PG&E Topock Compressor Station, Needles, California | December 9, 2015 | 504 KB | |
Click to Download | Final Basis of Design Report - Main Text | November 18, 2015 | 66.97 MB | |
Click to Download | Final Basis of Design Report - Appendix A Analytical Data | November 18, 2015 | 173.07 MB | |
Click to Download | Final Basis of Design Report - Appendix A1 Analytical Data | November 18, 2015 | 10.07 MB | |
Click to Download | Final Basis of Design Report - Appendix B Development Groundwater Models | November 18, 2015 | 73.56 MB | |
Click to Download | Final Basis of Design Report - Appendix C Design Criteria | November 18, 2015 | 97.65 MB | |
Click to Download | Final Basis of Design Report - Appendix D1 Plans and Equipment Lists | November 18, 2015 | 1.13 MB | |
Click to Download | Final Basis of Design Report - Appendix D2 Plans Drawings Part 1/2 | November 18, 2015 | 110.63 MB | |
Click to Download | Final Basis of Design Report - Appendix D2 Plans Drawings Part 2/2 | November 18, 2015 | 233.03 MB | |
Click to Download | Final Basis of Design Report - Appendixes E, F, G, J, K, M and N | November 18, 2015 | 112.05 MB | |
Click to Download | Final Basis of Design Report - Appendix H Final Cost Estimate | December 4, 2015 | 2.4 MB | |
Click to Download | Final Basis of Design Report - Section 8 | December 4, 2015 | 138.12 KB | |
Click to Download | Final Basis of Design Report - Appendix I Response to Comments | November 18, 2015 | 112.62 MB | |
Click to Download | Final Basis of Design Report - Appendix L Operation and Maintenance Manual | November 18, 2015 | 155.39 MB | |
Click to Download | Final Basis of Design Report Construction/Remedial Action Work Plan - Main Text, Appendixes A, B, C, D, E, J, K, M - W | November 18, 2015 | 128.83 MB | |
Click to Download | Final Basis of Design Report Construction/Remedial Action Work Plan - Appendix E Final Cost Estimate | December 4, 2015 | 2.4 MB | |
Click to Download | Final Basis of Design Report Construction/Remedial Action Work Plan - Appendix F Interim Measures 3 Decommission Work Plan | November 18, 2015 | 98.69 MB | |
Click to Download | Final Basis of Design Report Construction/Remedial Action Work Plan - Appendixes G and H | November 18, 2015 | 147.36 MB | |
Click to Download | Final Basis of Design Report Construction/Remedial Action Work Plan - Appendix I Cultural Historic Properties Management Plan | November 18, 2015 | 6.02 MB | |
Click to Download | Final Basis of Design Report Construction/Remedial Action Work Plan - Appendix L Soil Management Plan | November 18, 2015 | 59.38 MB | |
Click to Download | Final Basis of Design Report Construction/Remedial Action Work Plan - Appendix X Response to Comments | November 18, 2015 | 46.52 MB |