Skip to Main Content
FAQ
Glossary
Links
Contact
pge.com
Settings
High Contrast:
Off
Font Size:
100%
Default
High Contrast
Reset
Increase Font Size
Font
Increase
Decrease Font Size
Font
Decrease
×
Search
Menu
History
Cleanup
Groundwater
Soil
Public
Photos
Documents
Search
Search this website
Submit
Close Search
Click on the boxes in the flow-chart below to view documents from each phase of the process.
Public Involvement
Public Comment Documents
Documents for Review
Reference Documents
Public Notices
Fact Sheets
Public Involvement Plans
Other Public Involvement Documents
Site Investigation
Site Background and History
Historical Wells
RCRA Facility Assessment/Preliminary Assessment (RFA/PA)
RCRA Facility Investigation/Remedial Investigation (RFI/RI)
RFI/RI Volume 1
Groundwater
RCRA Facility Investigation/Remedial Investigation (RFI/RI)
RFI/RI Volume 2
Other Groundwater Documents
Arizona Groundwater Investigation
Groundwater and Surface Water Monitoring Plans
Groundwater and Surface Water Monitoring Reports
California Slant Wells
Miscellaneous Documents
Bedrock Investigations
East Ravine Investigation
Other Groundwater Studies
Pore Water and Seepage Study
Chromium Isotope Study
Background Study
TW-01 Aquifer Test
Soil
RCRA Facility Investigation/Remedial Investigation (RFI/RI)
Risk Assessment
Groundwater
Risk Evaluation Reports
Risk Assessment Work Plan
Other Risk-Related Documents
Soil
Risk Assessment Work Plan
Risk Assessment Reports
Cleanup Alternatives
Groundwater
CMS/FS Report
Core Testing
Groundwater Evaluations and Modeling
In-Situ Pilot Studies
Floodplain
Upland
Other Documents
Remedy Selection
Groundwater
Decision Documents
Statement of Basis
Proposed Plan
Record of Decision
CEQA/EIR
EIR Notice of Preparation and Fact Sheet
EIR Scoping Meeting Comments
EIR Documents
EIR Mitigation Measures Compliance Reports
CEQA-Related Studies
CEQA Documents for Interim Measures
CEQA Documents for In-Situ Studies
CEQA Other (Non-EIR) Documents
Public Comments
Remedy Decisions
Cleanup Implementation
Groundwater
Annual SWPPP Reports
Approvals and Communications
Five-Year Review
Remedy Design
Remedial Design Documents
Remedial Action Work Plan
Other Remedial Design/Remedial Action Documents
Construction Documents
Monthly Progress Reports
Programmatic Health and Safety Plan
Operation and Maintenance Documents
Others
Other and Environmental Impact Review
Sitewide
Approval Letters and Communications
Agreements
DTSC Site Designation Annual Reports
2000-2005
2005-2010
2010-Present
Biological Reports
Other
Groundwater
CEQA/SEIR
Final Subsequent EIR
Final SEIR Addendum
Appendix BOD
CEQA/EIR
Subsequent EIR
Subsequent EIR Notice of Preparation
EIR Notice of Preparation and Fact Sheet
EIR Scoping Meeting Comments
EIR Documents
EIR Mitigation Measures Compliance Reports
CEQA Documents for Interim Measures
CEQA Documents for In-Situ Studies
CEQA Other (Non-EIR) Documents
Public Comments
Remedy Decisions
Approval Letters and Communications
Interim Measures (IM)
IM-1
IM-2 Batch Treatment System Planning, Operations, and Monitoring
IM-3 Treatment System Planning
IM-3 Injection Area Characterization
IM-3 Treatment System Construction
IM-3 Treatment System Operations and Performance Monitoring
IM-3 WDR Reports and Compliance Monitoring
Soil
CEQA/EIR
EIR Notice of Preparation and Fact Sheet
EIR Documents
Approval Letters and Communications
Time Critical Removal Action
Non-Time Critical Removal Action
Project Schedule
Current Project Schedule
Former Project Schedule
Construction Documents
Folder Name
Monthly Progress Reports
Programmatic Health and Safety Plan