View of the IM-3 treatment plant looking south |
|
Workers connect drop pipe during installation of new pump at extraction well PE-01, March 2012. |
|
Installation of the new pump at PE-1, March 2012 |
|
Work done to Replace the pump at extraction well PE-1, March 2012. Photograph of new pump prior to installation |
|
Work done to Replace the pump at extraction well PE-1, March 2012 |
|
Work done to Replace the pump at extraction well PE-1, March 2012. |
|
Current Topock Site photograph looking south/southeast towards IM-3 Treatment Plant (2013) |
|
View of the MW-20 bench during IM-2 groundwater extraction activities, May 2004 |
|
Current Topock Site photograph looking north towards IM-3 Treatment Plant (2013) |
|
IM-1: Installation of MW-36 floodplain wells, April 2004 |
|
Logging core samples from IM-1 well drilling |
|
IM-1: Installation of floodplain monitoring wells, March - May 2004 |
|
IM-2: Protective berms and ground liners at the MW-20 bench |
|
MW-20-100 monitoring well with old extraction and containment system, 2004 |
|
View of the MW-20 bench during IM-2 groundwater extraction activities, January 2005 |
|
Braced framework of the Storage Tank foundation, November 2004 |
|
IM-3 batch treatment chemical containers at the MW-20 bench in 2004. |
|
Groundwater extraction from the MW-20 monitoring wells, March 2004 |
|
IM-2 water transport trucks arrive and depart from MW-20 bench, circa 2004-2005 |
|
Setting T-700 (treated water storage tank) at the IM-3 treatment plant, January 2005 |
|
Setting tanks T-100 (raw water storage) and T-700 (treated water storage) at the IM-3 treatment plant, January 2005 |
|
View of the IM-3 Treatment Facility from the Topock Compressor Station |
|
Construction of the Topock IM-3 Treatment Plant, January 28, 2005 |
|
View from South toward the IM-3 Treatment Facility, February 2006 |
|
Construction of the Topock IM-3 Treatment Plant, January 19, 2005 |
|
Construction of the Topock IM-3 Treatment Plant, December 17, 2004 |
|
IM-3 Treatment Facility after construction activities are completed, circa 2006 |
|
Construction of the Topock IM-3 Treatment Plant, July 2005 |
|
Construction of the Topock IM-3 Treatment Plant, April 2005 |
|
Construction of the Topock IM-3 Treatment Plant, March 9, 2005 |
|
Construction of the Topock IM-3 Treatment Plant, March 21, 2005 |
|
Construction of the Topock IM-3 Treatment Plant, February 2005 |
|
Construction of the Topock IM-3 Treatment Plant, December 11, 2004 |
|
Construction of the IM-3 Treatment Plan, January 2005 |
|
Water level monitoring during testing at injection well #3, date unknown |
|
Preparing to install injection well #3 casing |
|
Drilling of injection well #3 at night |
|
Compliance well installation in the injection well field |
|
Drilling a Compliance well. |
|
Placing Sand Cover on Electrical Conduits, December 2004 |
|
HDPE Pipe Installation: Laying the pipe after fusing sections together |
|
Two HDPE fusion machines working in tandem fusing 40-ft sections of 4'x8' double wall pipe, November 2004 |